Full Balcony Repair and Railing Replacement for CAPREIT in Etobicoke

- Established in 2013
- Fifteen recent projects
Balcony Restoration, Etobicoke: the facts
- Client
- CAPREIT
- Building
- Mid-rise apartment building
- City
- Etobicoke
- Work
- Full balcony repair, railing replacement and panel restoration
- Completed
- 2025
The work
Our crews saw-cut the damaged areas of the balcony slabs, broke the concrete out to expose and treat the reinforcing steel, and patched the repairs flush.
The repaired balconies were finished with a waterproof coating, and the old railings were replaced.
The salt-stained privacy panels were skim-coated, primed and repainted.
How the job ran
Residents stayed in the building throughout. Crews worked from boom lifts in phases and finished within one construction season.
How balcony repairs run
While a balcony is being repaired it is closed, residents clear their belongings from it beforehand, and noisy work is kept to set hours.
How long a programme takes depends on the work and the number of drops, a drop being one vertical line of balconies.
Localized concrete repairs take weeks and slab replacements and large scopes take months.
Before and after
01A privacy panel
A salt-stained privacy panel being measured Repainted panels at ground level, an unpainted one at each end
Photographs
Balcony fronts streaked with salt stains and marked in orange paint for repair Two workers breaking out concrete on a balcony from a lift A saw-cut repair area chipped out of a slab and marked in orange A cut-out in a slab underside, exposing corroded reinforcing steel A finished concrete patch
More projects
Services: Balcony restoration
- Balcony Concrete Restoration and New Guards for Orchard Apartments in Brampton
- Balcony Rehabilitation, Waterproofing and Masonry Repairs for CAPREIT in Brampton
- Strip-Search Area Renovation at the Hamilton-Wentworth Detention Centre
- Flooring Replacement in Judges' Chambers at the Ontario Court of Justice, 47 Sheppard Ave E