Strip-Bay Renovation at the Maplehurst Correctional Complex, Milton

The Maplehurst Correctional Complex in Milton, for Infrastructure Ontario and BGIS: the strip-search bays rebuilt, with modified concrete-block partitions, stainless-steel panels above them, steel edge trim and new benches. Completed in 2025.
An aerial view of a large institutional complex with parking lots and lawns
  • Established in 2013
  • Fifteen recent projects

Interior Renovation, Milton: the facts

Client
Infrastructure Ontario and BGIS
Building
Maplehurst Correctional Complex
City
Milton
Work
Strip-search bay renovation
Completed
2025

The work

The concrete-block partitions between the strip-search bays were modified, and stainless-steel panels were fitted above them.

Each bay was finished with steel edge trim and a new bench.

How the job ran

The bays were done in sequence, so part of the area stayed in use while the others were worked on. The facility cleared the workers beforehand, staff escorted them inside, tools were counted in and out, and the complex ran as usual.

Before and after

  1. 01The strip-search bays

    The bays before the work
    The partitions with stainless-steel panels fitted above them

Photographs

  • Concrete-block partition walls with numbered bays
  • A long run of partitions with their new steel panels
Reviewed October 2026Canada Contractors Inc.